Supervision of the construction of the road section called Franja Transversal del Norte, Section III, Playa Grande – Bifurcación Tres Ríos

Description:

Technical, administrative, economic, and environmental supervision of the road rehabilitation project.

The supervision included the review of the design and the elaboration of recommendations for the approval of the study and design of geometric, structural (bridges and vaults), hydrological and hydraulic (pipes, bridges and vaults), soils and pavements, geological and geotechnical elements of the project.

The component of the procedures for the acquisition and registration of the right of way for the State is of particular importance.

The supervision of the construction component included the review of the execution quantities, the control and quality assurance of the works executed, the environmental, technical and financial supervision, according to the technical specifications and the work contract.

Length of the road is 63.84 kilometers, which include 11 bridges built (300 mts. approx.).